警示桩我们大家在日常生活中应该会经常看到,对周边行人主要起到警示的作用,那么您知道警示桩等相关施工方法及其工艺是怎样的吗?下面小编为您简单讲解一番吧。
We all should often see warning piles in our daily life, which mainly plays a role in warning the safety of surrounding pedestrians. Do you know the construction methods and processes related to warning piles? Let's give you a brief explanation.
警示桩的使用意义
Significance of warning pile
1、警示桩有比重轻、抗腐化、耐老化,密封性好的特点。具有全天候防护效果,可以满足室外工程项目的恶劣环境
1. The warning pile has the characteristics of light specific gravity, corrosion resistance, aging resistance and good sealing. With all-weather protection effect, it can meet the harsh environment of outdoor engineering projects
2、具有良好的绝缘性能
2. Good insulation performance
警示桩等相关施工
Warning pile and other related construction
1、模具制作。警示桩模具采用圆钢加工制作,分左右两半,并且上面焊有紧固螺栓,以防止其振捣张开,影响其尺寸。
1. Mold making. The warning pile mold is made of round steel, divided into left and right halves, and is welded with fastening bolts to prevent its vibration from opening and affecting its size.
2、警示桩预制。预制采用集中预制,按设计要求,先浇筑保护层再放入预制好的配筋,再采用分层浇筑,用振捣器捣密实后浇筑第二层,待浇筑后达到凝固强度后,打开模具,将其表面缠覆盖薄膜进行养生。
2. Warning pile prefabrication. The prefabrication adopts centralized prefabrication. According to the design requirements, the protective layer is poured first, then the prefabricated reinforcement is placed, and then the layered pouring is adopted. The second layer is poured after being compacted with a vibrator. After the pouring reaches the solidification strength, the mold is opened, and its surface is wrapped with a film for curing.
地埋警示桩
3、警示桩基础开挖。 警示桩施工工具流动性大,零碎的特点,基础采用人工开挖,并将底部整平压实。
3. Warning pile foundation excavation. Warning pile construction tools have the characteristics of large fluidity and fragmentation. The foundation is excavated manually, and the bottom is leveled and compacted.
4、喷涂发光漆。 严格按图纸要求的颜色、间距涂刷发光漆。
4. Spray luminous paint. Apply luminous paint in strict accordance with the color and spacing required by the drawing.
5、安装。 根据地埋警示桩施工具有流动性大、零碎、基础混凝土用量少的特点,现将混凝土按配合比拌合成干料,在运现场进行加水拌合,这样既可以避免混凝土在运输过程中出现离析问题,还能节省资源,不会造成不必要的浪费。
5. Installation. According to the characteristics of large fluidity, fragmentary and small amount of foundation concrete in the construction of buried warning piles, the concrete is now mixed into dry materials according to the mix proportion, and then mixed with water after being transported to the site, which can not only avoid the segregation problem of concrete in the transportation process, but also save resources and avoid unnecessary waste.
以上就是今天为大家介绍的关于问题以及注意事项的全部内容,希望对大家能有所帮助,想要了解更多内容可以电话联系我们或者关注我们的网站http://www.binzhouhengtong.com,我们的工作人员会及时与您取得联系。
The above is all about the problems and precautions introduced to you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://www.binzhouhengtong.com , our staff will contact you in time.