电缆警示桩设置的位置和间距符合什么规定呢?这个问题是不少使用者都想明白的事情,下面就让小编为您简单讲解一番吧。
What are the requirements for the location and spacing of cable warning posts? This problem is something that many users want to understand. Let Xiaobian explain it briefly for you.
1、电缆警示桩应安装在管道的正上方,当电缆警示桩用作转角桩时,应安装在转角段中点的正上方。当管道正上方没有安装条件时,可设置在相对距离教近的路边绿化带内,并在电缆警示桩上标明管桩适意图。
1. The cable warning pile shall be installed directly above the pipe. When the cable warning pile is used as a corner pile, it shall be installed directly above the midpoint of the corner section. When there are no installation conditions directly above the pipeline, it can be set in the roadside green belt with a relatively close distance, and the cable warning pile shall be marked with the pipe pile intention.
2、全封闭禁入道路不得设置电缆警示桩。电缆警示桩的安装间距宜为100m。地面平坦、视碍少、管道路由顺直的情况,电缆警示桩的安装间距可大100m。特殊地段,具体铺设规范制度进行管道警示桩的铺设!
2. Cable warning posts shall not be set on totally closed roads. The installation spacing of cable warning piles should be 100m. When the ground is flat, there are few visual obstacles and the pipeline route is straight, the installation spacing of cable warning piles can be more than 100m. In special sections, lay warning piles according to specific laying specifications and systems!
3、电缆警示桩是埋设在天然气高压管线沿线以塑钢、玻璃钢、复合材质为主,涂有黄色标记的电缆走向警示桩,为起提示警示作用,标有“燃气管道、燃气电话、管线桩号、管线走向、电子巡检信息钮”,便于巡线抢修人员迅速找准管线位置,赢得抢修时机。
3. Cable warning piles are mainly plastic steel, glass fiber reinforced plastic and composite materials buried along the natural gas high-pressure pipelines, and are painted with yellow marks. For warning purposes, they are marked with "gas pipeline, gas telephone, pipeline pile number, pipeline direction and electronic Patrol information button", so that the patrol and emergency repair personnel can quickly find the pipeline position and win the emergency repair opportunity.
根据《城镇燃气管理条例》第三十六条要求,擅自拆除和移动天然气高压管线上埋设的电缆警示桩属于违法行为。
According to the requirements of Article 36 of the regulations on the administration of urban gas, it is illegal to dismantle and move the cable warning piles buried on the high-pressure natural gas pipelines without authorization.
The "seven major" step flow of cable warning pile construction: preparation work - Inspection and correction of relevant instruments - Measurement and setting out - fixed pile handover - planning route - adjusted pile handover - relevant information needs to be recorded after completion. For more relevant precautions, please visit our website http://www.binzhouhengtong.com consulting service