在现实生活中,我们经常会看到公路上外形美观的公路警示桩模具,对于该模具的制作,要准备好生产所需的工具和原料。而对于公路警示桩模具的使用过程,在使用前准备好完好无损的模具进行对接,以免发生漏液的现象,然后对模具内进行清理,这样可以保证模具的质量和生产环节的顺畅,在模具表面涂上一层机油,准备灌料,将模具放置于振动平台进行振动,保证原料间的紧密结合。
In real life, we often see the highway warning pile mold with beautiful appearance on the highway. For the production of the mold, we must first prepare the tools and raw materials required for production. For the use process of the highway warning pile mold, first prepare the intact mold for docking before use to avoid liquid leakage, and then clean the inside of the mold, so as to ensure the quality of the mold and the smoothness of the production process. Apply a layer of engine oil on the surface of the mold, prepare for filling, and place the mold on the vibration platform for vibration to ensure the close combination of raw materials.
公路警示桩模具的特点
Characteristics of mould for highway warning pile
一般来书公路警示桩模具呈现长方体条状,上面会刻有相应的字体,而且对于公路警示桩模具来说其性能强,耐冲击,耐老化,适温寿命强,标志较显眼,模具本身的成本低,效果好,而且对于安装方面也是非常的方便,便于工人的施工,模具的外形也较为美观,整个公路警示桩模具光滑度也非常的高,硬度也比较强。
Generally, the mold of the highway warning pile is in the shape of a rectangular strip, which is engraved with the corresponding font. For the mold of the highway warning pile, it has strong performance, impact resistance, aging resistance, strong temperature life, obvious signs, low cost and good effect. In addition, it is also very convenient for installation, convenient for workers' construction, beautiful shape of the mold, and the smoothness of the whole mold of the highway warning pile is also very high, The hardness is also quite strong.
公路警示桩模具的保存方法
Preservation method of mould for highway warning pile
对于公路警示桩模具的保存,不能让模具受酸腐蚀,酸性物质与水泥中的某些物质而发生反应,生成物体积松散、膨胀、遇水后非常难容易水解粉化,而且对于公路警示桩模具而言不能水多灰稠,常常忽视用水量对混凝土强度的影响,施工中便于浇捣,有的时候不认真执行配合比,会将混凝土搅得很稀,而多余的水分会在混凝土中留下孔隙,这样会使混凝土强度降低。
For the preservation of highway warning pile molds, first of all, the molds should not be corroded by acid. Acidic substances react with some substances in cement, resulting in loose and swelling objects. It is very difficult to hydrolyze and pulverize when they meet water. In addition, the molds of highway warning piles should not be too thick with water and ash. The impact of water consumption on concrete strength is often ignored. It is easy to pour and vibrate during construction, and sometimes the mix proportion is not carefully implemented, The concrete will be diluted, and the excess water will leave pores in the concrete, which will reduce the strength of the concrete.