欢迎来到滨州恒通电力器材有限公司网站,我们竭诚为您服务

行业新闻
当前位置:首页-资讯中心>行业新闻浅谈地埋标志桩的准备工序过程

浅谈地埋标志桩的准备工序过程

来源:http://www.binzhouhengtong.com/ 发布时间:日期:2022-08-11 0
标志桩是经过一次模压成型。其具有比重轻、抗腐蚀、耐老化、密封性能好,美观,具有全天候防护功能,能够满足室外工程项目中各种恶劣环境和场所的需要,克服了室外金属设备箱体的易锈蚀、寿命短和隔热保温性能差等缺陷。那么标志桩准备工序的大概过程是怎样的?
The sign pile is molded by one-time molding. It has light specific gravity, corrosion resistance, aging resistance, good sealing performance, safety and beauty, and has all-weather protection function. It can meet the needs of various harsh environments and places in outdoor engineering projects, and overcome the defects of outdoor metal equipment boxes such as easy corrosion, short service life and poor thermal insulation performance. What is the general process of the preparation process of the marker pile?
生产设备调试、清理磨具、缠聚酯召荡薄膜);
Commissioning of production equipment, cleaning of abrasive tools, winding of polyester film);
标志桩制衬工序(内衬树脂配、增强菊注材料准备、内衬层制作、标志桩初步自检、进入内衬远红外深度固化工序);
Marking pile lining process (lining resin preparation, reinforced chrysanthemum injection material preparation, lining layer fabrication, preliminary self inspection of marking pile, and entering the far-infrared deep curing process of lining);
标志桩远红外深度固化;
Far infrared deep curing of marker pile;
标志桩过程质量检验;
Process quality inspection of marker pile;
标志桩缠绕工序;
Marking pile winding process;
标志桩红外线固化及修整、脱模;
Infrared curing, trimming and demoulding of sign pile;
标志桩水压试验及摆放;
Hydrostatic test and placement of marker piles;
桩体在达到规定的干燥程度此沫盆后进行表面休整外表保持桩体表面干净整洁---送入图文印制车间;
After the pile body reaches the specified drying degree and the foam basin, the surface shall be trimmed and cleaned to keep the surface of the pile body clean and tidy --- sent to the graphic printing workshop;
标志桩外观字体的设计印刷着色程序;
Design, printing and coloring procedures for the appearance fonts of sign posts;
地埋标志桩
标志桩外包装程序。
Marking pile outer packaging procedure.
地埋标志桩产品特性:
Product characteristics of buried marker pile:
1. 地埋标志桩强度高,产品采用新型不饱和树脂材料,经高温压制而成。
1. The buried marker pile has high strength. The product is made of new unsaturated resin material and pressed at high temperature.
2. 地埋标志桩抗冲击.耐磨损. 耐高温. 耐腐蚀,故使用寿命长达30年。
2. Impact resistance and wear resistance of buried marker pile High temperature resistance Corrosion resistant, so the service life is up to 30 years.
3. 地埋标志桩外表美观,产品可制成各种颜色,字体图案清晰,警示性明显并可以美化城市环境。
3. The buried sign pile has a beautiful appearance. The product can be made into various colors, with clear font pattern and obvious warning, and can beautify the urban environment.
4. 地埋标志桩重量轻,便于运输安装,可大大减少劳动力并减轻劳动强度。
4. The buried marker pile is light in weight, convenient for transportation and installation, and can greatly reduce labor force and labor intensity.
5. 地埋标志桩防偷盗,该合成材料无回收价值,自然防盗。
5. The buried marker post is anti-theft, and the synthetic material has no recycling value, so it is naturally anti-theft.
地埋标志桩的准备工序过程的相关内容讲解完毕,当然如果您对此有什么疑问,欢迎来我们网站http://www.binzhouhengtong.com咨询了解,给您更好的帮助。
The relevant contents of the preparation process of buried marker piles have been explained. Of course, if you have any questions about this, please come to our website http://www.binzhouhengtong.com Consult and understand to give you better help.

相关产品 / Related products

  • 地钉

    地钉

  • 地钉

    地钉

  • 警示桩

    警示桩

  • 警示桩

    警示桩

截屏,微信识别二维码